Required Clearance(s)


Application / Permit:21016-10000-08187

Address:14843 VENTURA BLVD 91403
Status Status Date Status By Agency Required Clearance(s)
Pending 4/6/2021 City Planning Department City Planning Department "Q" conditions - "Q" conditions per 12.32G.2 (Qualified classification)
Pending 4/6/2021 Los Angeles Fire Department Los Angeles Fire Department Fire Marshal Fire Life Safety - Fire Marshal Fire Life Safety Projects
Pending 4/6/2021 Bureau of Engineering Bureau of Engineering Sewer availability - Sewer availability and connection
Pending 4/6/2021 City Planning Department City Planning Department Specific Plan - Approval for Specific Plan:VENTURA / CAHUENGA BOULEVARD CORRIDOR
Pending 4/6/2021 Department of Transportation Department of Transportation
Specific Plan - Compliance with DOT requirement in the Specific Plan: ZIVENTURA / CAHUENGA... Specific Plan - Compliance with DOT requirement in the Specific Plan: ZIVENTURA / CAHUENGA BOULEVARD CORRIDOR

Approved 4/13/2021 GUILLERMO PETRA Bureau of Engineering
Eng Process Fee Ord 176,300 - The fee authorized by Ord. 176,300 for PW/Eng to process cle... Eng Process Fee Ord 176,300 - The fee authorized by Ord. 176,300 for PW/Eng to process clearance(s) for LADBS issued permits

Hold-Released 7/15/2021 MARIA V VASQUEZ Department of Building and Safety
Hold - Hold RELEASED pd inv# 837691 on 5/17 thru lockbox /// applied to application - cont... Hold - Hold RELEASED pd inv# 837691 on 5/17 thru lockbox /// applied to application - contact Bldg. & Safety cASHIERS-CC CHARGEDBACK 04/21 CARDHOLDER CLAIMS CANCELLED/RETURNED SERVICE. REFER TO LOG CC1728

APPLICANT/REPRESENTATIVE: You are advised to initiate the approval process for the permit application clearance(s) marked as "Pending" as soon as possible in order to allow adequate time to obtain the approvals. Certain departments, such as the Department of City Planning, may require additional plan review and approval process, which may include mandatory appeal periods. It is recommended that you contact the agency before appearing in person. Remember to bring a copy of the permit application to the clearance agency for their reference.